Rainy4s
Senior Member
- Thread starter
- #1
Honda JP reveal the FL5 production line
K20c1 still build in Anna Engine Plant in Ohio
The transmission is built in Suzuka Factory(ι΄ιΉΏθ£½δ½ζ), then The engine and transmission are transported to the Ogawa engine Plant(ε°ε·γ¨γ³γΈγ³ε·₯ε ΄)by sea and land respectively.
Engine and transmission are combined and transported to Yorii Plant
In the video of 8:58, a JP media explain it in detail, translated by DeepL
"a special process is required for parts that are unique to the Type R. For example, the front suspension assembly that is unique to the Type R, and if you try to put it on a normal production line, it will interfere with other processes, so it is more efficient to extract this part and make it in a dedicated process. Looking at it, the front suspension assembly including the drive shaft is completed in 7 minutes of task time, as well as the Brembo calliper and large rotor. There are 4 specialists in 2 shifts, about 10 in total, and they have special assembly skills. It's a skill that feels good to look at."
Sponsored
Last edited: